Site layout
- Building placement and setbacks
- Existing conditions and demolition
- Property lines and easements from the survey
- Phasing when the project happens in stages
A site plan brings together building placement, parking, access, utilities, and drainage. We help you work through those details, prepare the drawings and calculations, and respond to questions during plan review.
A lot of projects that feel like building permits turn into site plan reviews. These are common situations where site plans may be needed.
Building placement, parking, service areas, and connections to public roads.
More square footage often means more parking, more drainage, or both.
A space that held one kind of business does not automatically work for another one.
Building placement, finished floor, grading, and utility connections on a lot that is being built on for the first time.
A current survey gives us the property boundaries, easements, and site information needed to start the design. We review what you have and let you know if additional survey information is needed before drawing begins.
Property boundaries, easements, flood information, and elevations needed for the site design.
What the property will be used for and roughly how much parking or traffic it will bring.
Water and sewer availability, or the plan for septic and well if the lot is outside those service areas.
If a reviewer has already looked at the project, those comments steer what the next version needs to say.
Tell us. We will go over what the property needs and what the jurisdiction expects, and you will know what to order before spending money on drawings.
Send the comments and current drawings. We will review what has been done, identify the changes needed, and confirm which parts we can take on.
We prepare the stormwater and drainage documentation that goes with the site plan, and we revise it when the reviewer has questions.
If you have a survey, send it. If not, tell us what you know about the lot and we will tell you what is needed next.